Journal archive
Author: am-webadmin
Specialist guidance from A&M Jewellery Workshop.
Published guidance
Articles in this archive.
How to Choose a Jewellery Manufacturing Partner in the UK
Choosing a UK jewellery manufacturing partner is a decision about how your designs will be interpreted, made and checked. A polished portfolio can show the style of work a business presents, but it does not explain who handles each stage or how a problem is resolved when a supplied component differs from the brief.
How Jewellery Is Manufactured: From Design Approval to Final Inspection
A finished piece of jewellery brings together design decisions and workshop operations that need to agree with one another. A model can describe an attractive ring while leaving questions about stone fit, assembly access or surface finishing unresolved. Understanding the jewellery manufacturing process helps a brand or retailer decide when those questions must be answered and who should answer them.
What to Include in a Jewellery Manufacturing Brief
A practical checklist for commissioning a one-off piece, prototype or repeat batch, covering materials, measurements, stones, finish and approval stages.
Preparing a complete workshop job
A clear intake record protects the piece, the client instruction and the workshop decision.
Understanding rhodium and surface finishes
Rhodium can change the colour of the surface. It cannot correct the condition underneath it.
How setting and claw work is assessed
The visible tip is only one part of the setting. Security depends on the stone, seat and surrounding metal working together.
What to include in a ring-sizing brief
Target size is essential, but it is not the only measurement the workshop needs.
The CAD brief checklist
A design reference shows the look. A production brief explains what must be made.
Hallmarking after an alteration
A repair can be technically sound and still require a hallmarking decision before it is returned to market.
Sending jewellery to the workshop
Agree the job first, separate every piece and keep evidence of condition and packing.
