Jewellery workshop · Hatton Garden, London

Standard schedule · Volume terms · Prices exclude VAT

Journal archive

Category: Repeat Production & Handover

Moving into repeat jewellery production, managing batches, supplied stones, workshop handovers and completion records.

Published guidance

Articles in this archive.

Moving from a Jewellery Prototype to Repeat Production

Moving from a jewellery prototype to repeat production requires more than instructing the workshop to make more of the sample. Development pieces can contain one-off adjustments, substitute materials or decisions that were never transferred into the final specification. Those details need to be resolved before a wider run begins.

Read article

Producing Multiple Jewellery Designs in One Order: How to Separate Specifications

Producing multiple jewellery designs in one order can simplify commercial coordination, but the workshop still needs separate production instructions for each distinct item. A shared delivery date or purchase order number does not mean the pieces share the same material, setting or finish requirement.

Read article

Reordering a Jewellery Design: What Needs to Be Reconfirmed?

Reordering a jewellery design should be simpler than developing it for the first time, but it still needs a current instruction. The phrase same as last time can conceal a different size mix, replacement stones or a component source that has changed. A short reconfirmation prevents the earlier order from becoming an inaccurate template.

Read article

How Batch Size Affects Jewellery Production Costs

Batch size can affect jewellery production costs because some work is shared across a run while other work is repeated for each item. Increasing the quantity may spread certain preparation costs, but it does not remove the setting, handling or inspection each piece requires. The effect depends on how consistent the run actually is.

Read article

Managing Variations in Supplied Jewellery Components

Variations in supplied jewellery components can change the work required to assemble, set or finish a piece. A repeated product reference is helpful, but the workshop still needs to assess the actual batch. Differences should be identified before they are spread through the production run.

Read article

Tracking Client-Supplied Stones Through Jewellery Production

Tracking client-supplied stones through jewellery production means preserving the relationship between the stones received, the pieces being made and the final handover. The record needs to distinguish allocated, set, unused and held stones, rather than rely on one overall parcel count.

Read article

Coordinating CAD, Casting, Setting and Finishing Across Workshops

Coordinating CAD, casting, setting and finishing across workshops requires a shared understanding of what each stage receives and what it must deliver. A design can be correctly approved yet still encounter problems if the wrong file reaches the caster or the setter receives a mount in an unsuitable condition.

Read article

Building a Jewellery Production Schedule Around a Collection Launch

A jewellery collection launch has several readiness dates, not just the day customers can order. Samples may be needed for photography, finished stock for inspection and product information for retail preparation. A production schedule should connect those requirements with the actual workshop route.

Read article

Handling Production Exceptions: Approvals, Rework and Delivery Changes

A production exception is a departure from the agreed route or requirement that needs a decision. It may involve an unsuitable component, missing information, a rejected finish or a delivery dependency that has changed. Handling it well means making the issue visible without losing control of the rest of the order.

Read article

Jewellery Production Handover: What Records Should Accompany a Finished Batch?

A jewellery production handover should explain what the client is receiving and what has been completed. The physical goods are only part of that transfer. References, approval records and an accurate account of outstanding work help the next person understand the order without retracing every workshop conversation.

Read article