Assessment
Production begins with a controlled specification and representative standard.
Production work begins with an agreed specification. CAD references, finished dimensions, metal, stone data, setting style, surface finish, tolerances and the division of responsibility between the client and workshop should be clear before a batch is released.
A repeat order is not treated as consistent until the incoming components and required operations have been reviewed. Variations in castings, stone calibration, assembly or surface condition can change both the workshop route and the achievable result.
At the bench
A traceable route from first-off approval to final inspection.
- 01
Production specification
Connect approved drawings, dimensions, component counts, stone information, finish standards and delivery requirements to one job reference.
- 02
First-off review
Complete and assess a representative piece where the construction or finish needs to be established before the main run.
- 03
Controlled production
Keep matched components, stones and exceptions identified as each approved workshop stage is completed.
- 04
Quality control and handover
Check the agreed dimensions, setting, operation and finish, then record exceptions before collection or return.
Job specification
Components, tolerances and workshop responsibility must be defined.
- Approved CAD, drawing or reference sample
- Metal, component and stone specifications
- Quantity and permitted tolerance
- Workshop stages required from A&M
Identify which components, stones and files are client-supplied, which stages A&M is expected to complete and how exceptions should be handled within the batch.
Trade pricing
The quotation reflects stages, consistency, quantity and quality control.
Manufacturing and production support is quoted from the approved stages, quantity, component condition and quality-control requirement. Consistent larger runs can be reviewed for preferential volume pricing; prices exclude VAT.
Prices exclude VAT. Larger repeatable runs can be considered for preferential pricing once the approved production standard is established. VAT is added at the applicable rate.

