Jewellery workshop · Hatton Garden, London

Standard schedule · Volume terms · Prices exclude VAT

Repeat Production & Handover

Jewellery Production Handover: What Records Should Accompany a Finished Batch?

A jewellery production handover should explain what the client is receiving and what has been completed. The physical goods are only part of that transfer. References, approval records and an accurate account of outstanding work help the next person understand the order without retracing every workshop conversation.

Wooden ring clamp, mallet and hand tools on a jewellery bench

A jewellery production handover should explain what the client is receiving and what has been completed. The physical goods are only part of that transfer. References, approval records and an accurate account of outstanding work help the next person understand the order without retracing every workshop conversation.

Agree the required records when the job is commissioned. This makes the final handover a confirmation of information already maintained through production, rather than a last-minute attempt to reconstruct it.

Discuss jewellery production handover records

Specify the goods, supporting records and supplied materials expected at handover.

Identify the goods precisely

List products and variants with their quantities, using the references from the order. For paired goods, state whether the count refers to pieces or complete pairs. Keep partial deliveries distinguishable from the full original quantity.

Identify the controlling design revision or approved sample where it matters to later production. The client should be able to connect the received piece with the standard that was accepted.

Describe the completed stages

State the condition in which the goods are supplied. A prepared mount, a set piece and an item with all agreed finishing complete represent different handover states. Do not use one broad word such as finished where later services remain.

Confirm any outstanding hallmarking, engraving or other agreed stage and who is responsible for it. A task outside the workshop’s scope should still have a clear place in the client’s next steps.

Include relevant acceptance information

Retain the inspection or approval record appropriate to the order. This may include important measurements, sample sign-off or confirmation that a previously held feature has been rechecked. Keep the record proportionate and useful.

Do not describe the goods as independently certified unless that has actually occurred and the evidence is available. Workshop inspection and a third-party certification are different statements.

Before the next production step

Reconcile completed stages and outstanding items before arranging collection.

Reconcile stones and supplied components

Account for stones set in completed items, unused stones returned and any material still held. Connect individually identified stones or matched groups with their final disposition where the job requires that level of detail.

Include unused components and relevant supporting documents in the agreed reconciliation. A total parcel count cannot by itself explain which materials have been used or why something remains at the workshop.

Make exceptions and partial completion visible

List held, rejected or outstanding pieces separately, with the current decision and next action. An approved concession should remain linked to the affected item. It should not be hidden inside a general statement that the batch passed inspection.

A&M’s manufacturing process includes recording exceptions before collection or return. For postal handover, follow the separate workshop by post arrangements agreed for the consignment.

Close the order with a usable record

The handover should let the client identify accepted goods, reconcile supplied materials and see any remaining responsibility. A clear final record supports retail preparation, future service and the next repeat order.

Plan the work with A&M

A&M can assess your trade enquiry in the context of the actual piece and requested workshop stages. Bring the references discussed in this guide so the next decision can be made on clear information.

Frequently asked questions

Is an invoice enough for a production handover?

An invoice records commercial information, but it may not describe the product revision, completed stages, stone reconciliation or outstanding work. Agree any additional production records needed.

How should a partial batch be documented?

List the exact items and quantities transferred, with the balance outstanding and its current status. Keep this separate from the total quantity on the original order.

Should approved exceptions be mentioned again at handover?

Yes, where they affect the received goods or later use of the record. Link each exception to the relevant item and retain the scope of the approval.

Related Reading

Workshop support

Discuss the practical requirements with A&M.

Send the item details, condition, required result and relevant measurements for an informed initial assessment.

Contact the workshopApply for a trade account